40MWp Molong Solar Farm Development

TEC-C developed the 40MWp Molong Solar Farm and on completion of the development and securing the offer to connect, sold the project rights to Amp Energy – providing a basis to generate solar energy for approximately 35,000 NSW homes.

Approach:

Having acquired the site in 2017, TEC-C prepared and obtained approvals for the Construction Environmental Management Plan from Cabonne Council.

 

Undertaking the entire grid connection and application process, TEC-C delivered designs to IFC stage and conducted the required studies to meet industry specifications and standards – gaining project and grid connection approvals from AEMO and TransGrid.

DJI_0085_ed

Key features:

  • Network modelling studies undertaken to receive 5.3.4A letter from AEMO
  • Obtained Generator Performance Standard letter of acceptance from TransGrid for grid connection approval
  • Executed project and connection agreements with TransGrid
  • Developed the solar farm, delivering detailed designs to IFC stage