Having acquired the site in 2017, TEC-C prepared and obtained approvals for the Construction Environmental Management Plan from Cabonne Council.
Undertaking the entire grid connection and application process, TEC-C delivered designs to IFC stage and conducted the required studies to meet industry specifications and standards – gaining project and grid connection approvals from AEMO and TransGrid.