EPC of a 5MW/10MWh Battery Energy Storage System (BESS) connecting to the 22kV AusNet Services Distribution Network.
EPC of an integrated on-grid hybrid generator and advanced microgrid system on an active campus.
Design, supply and installation of two separate off-grid systems at Beecroft Weapons Range wit hall associated civil, structural and electrical works.
Connection to TransGrid’s Molong Substation and joint commissioning with the TNSP.
Further scope of work, won by an extremely cost-effective solution.