Balance-of-Plant (BOP) works for 100MW/200MWh BESS and EPC works for the 120MVA 220/33kV substation grid connection.
Design and Construction (D&C) of the substation and 132kV Overhead Line, to connect the 260MW solar farm into Transgrid’s network.
Brownfield works at Deer Park Terminal Station, including seven new 66kV switchbays and secondary systems updates within a live substation environment.
Design and Construction (D&C) of the substation works, connecting the Melbourne Renewable Energy Hub, 600MW/1.6GWh battery project in Melbourne.
EPC of a 5MW/10MWh Battery Energy Storage System (BESS) connecting to the 22kV AusNet Services Distribution Network.
EPC of an integrated on-grid hybrid generator and advanced microgrid system on an active campus.